Downriver Linked Greenways
Build an exact selection from the existing archive, with the formats and rights your project needs.

Explore recorded coverage
Loading the coverage map…
Shaded cells locate recorded imagery at about 110 m scale. They do not indicate continuous capture, surveyed boundaries or current access.
Shape this collection around your project
1–10 trail features; named segment snapshot; network selection; optional surface/feature annotations
A selection from the existing archive. Exact scene membership, geographic boundaries, formats and quality are confirmed in the quote. Historical imagery does not establish current access or conditions.
- Capture period
- 2018-07-05 – 2019-10-15
- Coverage states
- MI
- Candidate source records
- 6,520
- Source sections
- 34
Inventory checked 2026-09-15. State coverage uses individual recorded scene positions and 2025 Census boundaries. Counts describe source records; imagery, coordinate accuracy and license scope are reviewed for delivery. A river title does not promise every access site or the entire waterway.
Included source sections
Each row is an indexed source section. Several sections can belong to one trail or waterway.
- Brownstown Township Trail Network479 candidate scenes · t360:trail:4422
- City of Taylor Trail Network265 candidate scenes · t360:trail:4591
- Civic Center Park Trail 4_City of Woodhaven138 candidate scenes · t360:trail:4426
- Civic Center Park Trail_City of Woodhaven315 candidate scenes · t360:trail:4423
- Civic Center Trail 2_City of Woodhaven114 candidate scenes · t360:trail:4425
- Civic Center Trail Spur_City of Woodhaven18 candidate scenes · t360:trail:4424
- Detroit Heritage River Water Trail_Elizabeth Park Marina13 candidate scenes · t360:trail:4095
- Downriver Linked Greenways17 candidate scenes · t360:trail:4346
- Downriver Linked Greenways North-South Connector527 candidate scenes · t360:trail:3998
- Elizabeth Park Dr.116 candidate scenes · t360:trail:4345
- Elizabeth Park Overlook9 candidate scenes · t360:trail:4000
- Elizabeth Park Trail Connector11 candidate scenes · t360:trail:4344
- Elizabeth Park Trail_City of Trenton78 candidate scenes · t360:trail:3999
- Groh Bike Path West: Meridian Road to Boucher Road126 candidate scenes · t360:trail:4478
- HCMA East-West Connector814 candidate scenes · t360:trail:3991
- Huroc Park Trail_City of Flat Rock74 candidate scenes · t360:trail:3894
- Lake Erie Metropark Hike-Bike Trail115 candidate scenes · t360:trail:4307
- Lake Erie Metropark Loop72 candidate scenes · t360:trail:3993
- Lake Erie Metropark Marina13 candidate scenes · t360:trail:4096
- Lake Erie Metropark Parking Connector40 candidate scenes · t360:trail:3994
- Lee Road26 candidate scenes · t360:trail:3997
- Lower Huron & Willow Metroparks Trail Connector435 candidate scenes · t360:trail:3925
- Lower Huron Metropark Hike-Bike Trail491 candidate scenes · t360:trail:3893
- Marina Observation Point10 candidate scenes · t360:trail:3996
- Marina Point Trail80 candidate scenes · t360:trail:3995
- North South Trail337 candidate scenes · t360:trail:4476
- North South Trail 179 candidate scenes · t360:trail:4474
- North South Trail 253 candidate scenes · t360:trail:4475
- North South Trail 4113 candidate scenes · t360:trail:4477
- North South Trail 639 candidate scenes · t360:trail:4479
- North South Trail 7198 candidate scenes · t360:trail:4480
- Oakwoods Metropark Trails574 candidate scenes · t360:trail:3926
- Willow Metropark Hike Bike Trail437 candidate scenes · t360:trail:4180
- Willow Metropark Trails294 candidate scenes · t360:trail:3891
