← Browse collections
Trails and greenways · COL-3590

I-275 Metro Trail

Build an exact selection from the existing archive, with the formats and rights your project needs.

Recorded view from I-275 Metro Trail — I-275 Metro Trail
Actual recorded view · I-275 Metro Trail · 2018-10-11. Open photo ↗

Explore recorded coverage

Recorded imagery areas4,394 recorded scenes

Loading the coverage map…

Shaded cells locate recorded imagery at about 110 m scale. They do not indicate continuous capture, surveyed boundaries or current access.

Draw an area for a custom quote →

Shape this collection around your project

1–10 trail features; named segment snapshot; network selection; optional surface/feature annotations

A selection from the existing archive. Exact scene membership, geographic boundaries, formats and quality are confirmed in the quote. Historical imagery does not establish current access or conditions.

Capture period
2018-10-11 – 2018-10-12
Coverage states
MI
Candidate source records
4,394
Source sections
3

Inventory checked 2026-09-15. State coverage uses individual recorded scene positions and 2025 Census boundaries. Counts describe source records; imagery, coordinate accuracy and license scope are reviewed for delivery. A river title does not promise every access site or the entire waterway.

Included source sections

Each row is an indexed source section. Several sections can belong to one trail or waterway.

  • I-275 Metro Trail
    2,069 candidate scenes · t360:trail:4019
  • I-275 Metro Trail Ford Road South
    1,806 candidate scenes · t360:trail:4022
  • I-275 Metro Trail River Rouge South
    519 candidate scenes · t360:trail:4021